Job Safety Analysis/ Job Hazard Analysis for the use of hand tools
contoh JSA OSHAFull description
Keselmatan alat angkat dan angkut
las..Deskripsi lengkap
las..
Deskripsi lengkap
chipping
jsa radioFull description
PondasiDeskripsi lengkap
craneDeskripsi lengkap
Full description
JSA Splicing
fapfapFull description
Full description
Untuk panduan membuat JSA (JOB SAFETY ANALYSIS)
JSA
metode jsa
JSA ChevronDescription complète
crane job safety analysis
Deskripsi lengkap
SGD SAIPEM CAMP ACCOMODATION AND BUILDING FACILITIES JOB SAFETY ANALYSIS PROJECT OPERATIONAL CAMP
JSA NO. 003
Page 1 of 1 Date 07/01/2013
Activity: Painting work
Steps Painting Work
Hazards
Inhalation Fumes, vapors and gases generated during use. Burns due to Hot surface of paint stripper, contact with paint stripper element Electric shocks due to improper operational & maintenance.
Control Measures to be Enforced
Supervisor
Properly ventilate work area, use disposable respirators.
Drip trays shall be used to avoid any leakage of painting liquids. Minimum quantity of the paint shall be store at t he site. All painting material shall be stored at well ventilated areas. All painting material shall be used as per manufacturer’s provided material safety data sheets. All painting activities shall be carried out by experienced workers. All operatives of paints shall be explained the hazards & their precaution associated with the paints. All workers shall be fully equipped with safety shoes, hand gloves, hard helmet, face shield & cover-alls. Washing facility shall be available to wash the effected parts of the body by paints.